Reader Ad Slot
Reader Ad Slot placeholder
If you would like to support SpookStack without paying out of pocket, please consider allowing advertising cookies. It helps cover hosting costs and keeps the archive free to browse. You can change this choice at any time.
Mississippi Burning MIBURN Case — Part 5
Page 10
10 / 105
the sides of these hills. It measured approximately 547 feet in
length, that is, from the points of intersection of the dam and
hills. At its highest point from the valley lying between the
hills it measured approximately 20 feet. At this poiht, the
widest point of the base of the dam, the base measured approximately
83 feet in width.
Prior to beginning excavation, SA
was assigned the responsibility of photographing the site to
record the condition of the dam and ‘surrounding areas at the
time of entry into the area. pI e
oe,
— — *
SA Cee... ; assigned to record the various observa-
tions of the personnel engaged in the digging operation and to
maintain a log of the activities of these personnel. {7¢@
SA | assigned to the mapping and charting of the
dam and surrounding areas and SA was assigned to the respon-
sibility of collecting and preserving whatever items of evidence
might be uncovered during the excavation process. f7¢
IV. OBSERVATIONS DURING EXCAVATION: AT DAM SITE
The excavation at the point selected began initially
with the use of the bulldozer opening a small pit to permit
the dragline bucket to begin to remove earth from the dam. After
approximately two hours of excavating, faint traces of the odor
of decaying organic material were noticeable. At this time the
dragline operator was instructed to proceed with the excavating
operation exercising extreme caution. The Agents assigned to
the excavation project maintained close supervision and constant
surveillance of the excavation pit. The earth being moved was
closely observed as it was loaded and unloaded from the dragline
bucket.
At approximately 2
oe ee cees oe | Dane ee tae A
decaying flesh was clearly d
—— #h
50 P-m. the pungent odor of
scernible. At that time the dragline
a
.
faan
Lou
operator vas instructed to cease his operation. Agents then
Community corrections
No user corrections yet.
Comments
No comments on this document yet.
Bottom Reader Ad Slot
Bottom Reader Ad Slot placeholder
If you would like to support SpookStack without paying out of pocket, please consider allowing advertising cookies. It helps cover hosting costs and keeps the archive free to browse. You can change this choice at any time.
Continue Exploring
Agency Collection
Explore This Archive Cluster
Broad Topic Hub
Topic Hub
letter
bureau
Related subtopics
Subtopic
Subtopic
Subtopic
Subtopic
Subtopic
Subtopic